PPII Lateral Rehabilitation

Shorewood's 2011 Comprehensive Facility Plan included a goal to reduce inflow and infiltration (I & I) in the separated sewer areas of the Village by 40% by 2021.  Lateral rehabilitation has been identified as a key strategy to achieve that goal.

A Private Property Lateral Rehabilitation Program and Schedule was developed based upon the results of flow monitoring in Basins 1 and 6, both of which have been designated by MMSD as under-performing sewersheds.  The schedule, illustrated at right, targets the block areas which have contributed higher-than-expected flows to the sanitary system during rainfall events during our evaluations. 

The Private Property Lateral Rehabilitation Program is currently 100% funded through the MMSD and Village of Shorewood. Laterals are rehabilitated at no out-of-pocket cost to property owners identified in a specified program year.

View program presentation (PowerPoint).

Program Achievements to Date


224 private laterals - over 10,000 lineal feet of pipe - have been lined since 2012. For a list of property addresses please click here.

Pre-Lining video

pre video

Post-Lining video

post video still

2017 Program

 
The 2017 program includes the 4000-4200 blocks of N. Larkin Street.  Eligible property owners will be notified via U.S. mail. Copies of materials can be viewed below:

Resident letter
Consent form
Informational flyer
Frequently Asked Questions

For additional information on how laterals may contribute to basement backups, please click the image.

basement connection
PPII Lateral Rehabilitation Schedule
Please click to view enlarged image.

I am so pleased the Village of Shorewood is proactively addressing Infiltration/Inflow of storm water into the sanitary system.  It was an easy decision to participate in the private property lateral lining program as I essential got a “new sewer” to benefit both my property value and the Villages objectives of reducing I&I.  I was very satisfied that there was very little disruption to my yard and the Village was timely in restoration of areas disturbed during the work.